Ken Mattingly was moved with the assistance crew into parallel teaching with Anders as backup CMP in the event that Apollo 11 was delayed previous its supposed July launch day, at which point Anders will be unavailable.[fifty nine]Upon arrival on the Vertical Assembly Constructing, Just about every phase was inspected inside of a horizontal positio